Resources

North America’s Largest Utility Ensures Sustainability & Resilience Using GenCell’s Substation Backup Power Solution

Shelli Zargary
October 10, 2024

CASE STUDY: GenCell’s Hydrogen2power™ Technology + GEMS™ Energy Management Software Optimize Substation Performance & Interoperability

GenCell REX substation backup power deployment at CFE Mexico

Today power utilities are challenged to withstand increasingly frequent and severe climate and weather incidents while at the same time incorporating volatile renewable resources into the grid and meeting ever-increasing power demands, challenges that together exponentially increase the risks of outages.

To meet these tough challenges, the largest North American power utility, operating thousands of substations across a vast territory vulnerable to increasingly frequent and extreme inclement weather and climate disasters, has deployed several hundred GenCell REX™ resilient, zero-emission and uninterrupted extended duration ( 72+ hours) and weather-resistant auxiliary DC power units at critical substation sites. The units were installed with proprietary GenCell GEMS™ cross-organizational energy management software to both enhance control of and maximize substation resilience across their transmission and distribution network.

To download this case study, click here.

—Welcome to the new gold standard for a sustainable energy future.

Learn more

Our website use cookies. By continuing, we assume your permission to deploy cookies as detailed in our Privacy Policy.

To visit the home page of GenCell Ltd., holding company of GenCell Inc.: