News

EV Engineering + Infrastructure: First fast DC EV charging solution deployed in Sacramento

Editor
August 1, 2024

EV Engineering + Infrastructure: First fast DC EV charging solution deployed in Sacramento

The California Mobility Center (CMC) and GenCell have partnered to demonstrate the zero-emission GenCell EVOX bridge power solution for fast EV charging at CMC’s Sacramento facility throughout 2024.

The GenCell EVOX combines hydrogen fuel cells generating 240 kWh/day with 372 kWh of lithium-ion batteries and proprietary AI-driven DERMS software to provide reliable, long-duration, grid-independent, climate-resilient power for critical applications.

This provides a rapidly deployable, robust micro-grid type system that illustrates integrated energy storage and hydrogen-based power generation applications for areas that might not have sufficient grid power.

“The partnership with GenCell is another example of the CMC helping accelerate and promote clean energy and transportation technology and ensuring California can meet its clean air goals,” said Orville Thomas, CEO of the California Mobility Center. “The CMC’s current facility, like a lot of workplaces and fleet depots in California, doesn’t have sufficient power for fast charging. This collaboration to showcase the GenCell EVOX will highlight power solutions that can be used to bridge between where technology is now and where we need it to be.”

To read the full article in EV Engineering Online, click here.

EVOX deployment at California Mobility Center

—Welcome to the new gold standard for a sustainable energy future.

Learn more

Our website use cookies. By continuing, we assume your permission to deploy cookies as detailed in our Privacy Policy.

To visit the home page of GenCell Ltd., holding company of GenCell Inc.: